Flatiron’s Permanent-Plaza Plans: Read the Legend Before You Quote the Stone

Flatiron’s October 2026 design boards show a mixed material palette. Learn what granite inlays, paving labels and seating images do—and do not—tell a dealer.
Square Feet Don’t Order the Corners: A Better Stone-Veneer Takeoff

A September NYC plaza-access debate highlights why project teams should confirm ownership, authority, access and approved scope before planning material releases.
Public Access Is Part of the Brief: What NYC’s Plaza Debate Means for Material Inquiries

A September NYC plaza-access debate highlights why project teams should confirm ownership, authority, access and approved scope before planning material releases.
Sealed Doesn’t Mean Stain-Proof: Choosing Exterior Natural-Stone Treatments

Choose exterior stone treatments by stone, finish and intended use. Review product limits, test patches, acceptance and care records before full application.
The Pallet Is Part of the Plan: Ordering Pavers for Mechanical Installation

Before ordering mechanically installed pavers, coordinate the pallet layer, laying pattern, equipment, special pieces and delivery sequence with the project team.
Before You Order a Stone Wall Cap: Finished Width, Drips, Flashing and Special Pieces

Order stone wall caps from the accepted detail. Check finished wall width, overhang, drip geometry, flashing, joints and special pieces before fabrication.
100 Gold Street Enters Public Review: What Dealers Should Track Beyond the Housing Count

100 Gold Street’s September 2026 update adds a public-review milestone. Learn how dealers track proposed public-realm work without assuming material approvals.
A Rooftop Paver Order Starts Below the Pavers: A Dealer’s Coordination Checklist

Before quoting rooftop pedestal pavers, coordinate roof capacity, support, drainage access, perimeter restraint and furnishings with the project team.
Coney Island’s Boardwalk RFQ: How Dealers Should Read a Billion-Dollar Waterfront Program

NYCEDC’s September 2026 boardwalk RFQ is an early procurement milestone. Learn what dealers should verify before treating waterfront scope as a material order.
Don’t Hide the Movement Joint: Manufactured-Stone Veneer Coordination Before Layout

Resolve manufactured-stone veneer movement joints before layout. Confirm substrate joints, transitions, sealant details and approval responsibilities.